
POSCO E&C’s first cable stayed bridge over the sea that improvedtransportation in island regions.
Jido-Imjado Bridge construction project was the first cable stayed bridge built over the sea that reduced the travel time from one hour by a vessel to five minutes by a car, significantly improving the transportation system for local island residents. In addition, POSCO E&C used high-strength steel and won the Best Construction Project Award in a symposium held by the Korean Society of Steel Construction.