Jido-Imjado Bridge

POSCO E&C’s first cable stayed bridge over the sea that improved transportation in island regions.

Jido-Imjado Bridge construction project was the first cable stayed bridge built over the sea that reduced the travel time from one hour by a vessel to five minutes by a car, significantly improving the transportation system for local island residents.  In addition, POSCO E&C used high-strength steel and won the Best Construction Project Award in a symposium held by the Korean Society of Steel Construction. 

  • Period
    Period
    2013.10 - 2021.03
  • Place of order
    Place of order
    Iksan Regional Construction and Management Administration
  • Construction details
    Construction details
    Road Construction : L = 4.99km (2 Lanes) - cable stayed bridge 2EA : L-1,885m, intersection 3EA
  • Location
    Location
    Imja-myeon, Sinan-gun, Jeollanam-do, Republic of Korea

Personal Data Processing Policy Legal Disclaimer

CCTV Operation policy