At POSCO E&C, we are solidifying our status as a full-service EPC provider by offering world-class industrial solutions for steel and energy plants.
Since contributing to Korea's nascent steel industry by successfully constructing power plants and the world's largest integrated steelworks, we have been broadening our EPC capability portfolio in battery materials and hydrogen plants, critical components of future industries.
Learn More on Business Performance
The steelmaking industry serves as the foundation of all other industries.
We have harnessed our state-of-the-art technology to enhance the competitiveness of the local steelmaking industry.
-
Brasil csp steel plant project
The Brazil CSP Steel Plant is the largest steel plant construction project ever won by a domestic construction company. It has fully demonstrated POSCO E&C's business capabilities in the domain of steel plants, and it will be a project that will remain in the history of Korean construction companies.
Pecem Industirial Complex, Ceara state, Brazil2012.09 - 2016.08
view more
Learn More on Business Performance
We are opening new energy frontiers – fire, light and wind. We are driven by the ambition to build a brighter, more sustainable and more prosperous world.
-
PANAMA COLON Combined Heat & Power Plant
Panama Colon gas-to-power (GTP) project was to build an LNG terminal and the GTP power generation facility in Colon, an area located approximately 60 km away from Panama City, the capital of Panama.
Colon, Panama2016.05 - 2018.07
view more
Learn More on Business Performance
We delivered outstanding results in complex and demanding petrochemicals projects. We stand at the cutting edge of LNG terminal construction.
We also offer sustainable chemical engineering solutions for hydrogen, an energy source of the future.
-
Gwangyang LNG Terminal (Tank No.6)
In response to the growing demand for LNG, POSCO INTERNATIONAL has focused on market expansion and decided to expand the existing Gwangyang LNG Terminal facilities. Through an investment of approximately KRW 143.7 billion, the installation of Tank No. 6 with a capacity of 200,000 ㎘ is scheduled to be completed in May 2024. Gwangyang LNG Terminal’s storage capacity will increase from 730,000 ㎘ (tanks nos. 1–5 in operation) to 930,000 ㎘. Similar to tank no. 5, tank no. 6 will be built through cooperation amongst the POSCO Group affiliates. For the first time in the world, POSCO’s proprietary technology in high manganese steel for LNG tanks and high-strength steel material (STP550) will be applied to tank no. 6. In addition, POSCO E&C’s onshore LNG tank design technology verified across the world along with the installation technology jointly developed with POSCO, will further contribute to this project. Through the incorporation of POSCO INTERNATIONAL’s stability verification capacity and operating technology, Gwangyang LNG Terminal is expected to become a top-tier premium facility.
Gwangyang, Korea2021.01 - 2024.05
view more
Learn More on Business Performance
We undertake a wide range of industrial plant projects that drive humanity’s progress and vitalize industry.
-
POSCO Chemical Rechargeable Battery Anode Material Plant
POSCO E&C is currently implementing phase 2 of the project to extend POSCO FUTURE M Anode Material Plant 2 (annual production capacity: 22,000 tons) in Sejong.
Sejong, Korea2018.10 - 2020.03
view more